We’ve been side-tracked the last week or so from our kitchen renovations. Our in-floor heating conked out (see Feb 1 2008).
Dave decided to do it himself with expert help from my Dad. It wasn’t in the plan. We were supposed to be doing the kitchen floor so that we can move forward with new appliances etc.
The in-floor system isn’t our only source of heat but the house is calibrated assuming that it does function. Our bedroom is one of the rooms that enjoys the warmth of heated floors. The past couple of weeks have been chilly. We still get some heat but not to the level that I like.
I have to admit the last day or so I’ve been grumpy about the cold floors. Finally today it appears to be done. I won’t get to enjoy it until tomorrow night though. We are on our way to Tremblant.
Today is a good day. The heat is on. The Sens play the Habs. Alfie & Heater are both back playing. Go Sens Go. The heat is on.